Retroreflective bands on portable delineators. Verify the required signs are placed during the cleaning and painting activities and removed at the end of each work shift. They require lane closure charts that specify when and how many lanes may be closed for construction. Verify that Type 1 and Type 2 flashing arrow signs comply with the specification requirements, including number of panel lights, display modes, power source, and devices to plumb and level the trailer. caltrans. Verify the proper types of flashing arrow signs are used. Any activity requiring a full roadway closure, Rapid-strength concrete operations, including concrete slab replacement, Roadway excavations that encroach on the traveled way and are not protected by K-rail, Cold planing hot mix asphalt for depths of 2 inches or greater, Asphalt or concrete pavement sealing operations, Placement of reinforcing steel or structural members, Falsework erection or removal, including adjustments. Verify that portable delineators meet the dimension requirements. When it is not possible to maintain a width of 60 inches, provide a 60-by-60inch passing space at least every 200 feet to allow individuals in wheelchairs to pass. During the project initiation or planning stage, Caltrans considers TMP measures with associated road user costs and additional construction costs to the fullest extent feasible. They are absolute. Include appropriate signage. All closure information is continually updated and subject to change. Verify the contractor notifies and cooperates with local authorities wherever the local authorities regulate traffic. Frequently, the plans for stage construction, detour, or traffic handling will require arrays of temporary crash cushion modules. Adjustments should be made to create adequate sight distance, to avoid locations that require drivers to make multiple decisions, to accommodate expected queues, and to coordinate activities at multiple locations. For public convenience, such as routing traffic through detours when not shown on the plans and when ordered by the engineer, providing flaggers is change order work for which Caltrans pays 100 percent. During night operations, the vehicles should have their headlights turned off and their hazard lights and flashing amber lights turned on. If you accept a closure request, the status will change to PENDING. If you reject a closure request, LCS will send the contractor an email asking for a correction and resubmission. Pay special attention to the aiming of the sign whenever solar-powered signs are used. Use of 180-day temporary pavement markers on an open-graded surface is not advised; when removed, the marker glue can peel up the open grade. A median barrier, bridge rail, or retaining wall may block worker escape routes. Avoid blinding drivers in approaching vehicles when adequately lighting work areas. The Code of Federal Regulations, Title 23, Section 630, Subpart J, Work Zone Safety and Mobility, (23 CFR 630 Subpart J) requires Caltrans to adopt a policy that implements TMPs on all federally funded highway projects. If the contractor requests usage of alternative temporary crash cushion modules, verify that their proposed modules are on the Authorized Material List for Highway Safety Features. Do not permit any closures until the contractor submits this plan and it is authorized in accordance with the specifications. Allow only one type of portable delineator on the project. 2 Comments. Confirm that portable delineators remain upright when unattended, otherwise require the contractor to place a ballast on the delineators base. The following procedures are intended to assist resident engineers in obtaining and tracking COZEEP services and to help Caltrans reconcile the CHP billing system and facilitate payment to the CHP. Obtain the information of trained contractor representatives, including whether they will be requesting or providing a status of closures, or both. Remember that the motorist has no knowledge of the traffic control plan and is entirely dependent on the system for warning and guidance. Follow the districts instructions for distributing news releases. If temporary traffic control devices are damaged, displaced, or stop operating or functioning as described from any cause during the progress of the work, have the contractor repair, repaint, or replace the components and restore them to their original locations and positions. Make safety and convenience the primary design considerations. Allow the use of paint only if the temporary traffic stripe is not required to be removed. Verify barricade construction complies with Section 12-3.10, Barricades, of the Standard Specifications and sheet A73C, "Delineators, Channelizers, and Barricades," of the Standard Plans. Division of Traffic Operations - Road Information - California Highway Information Road Information Know before you go : National Weather Service - Caltrans Social Media - QuickMap Real-time Travel Information Check Current Highway Conditions Enter Highway Number (s) You can also call 1-800-427-7623 for current highway conditions. The Caltrans QuickMap drop down menu labeled Options enables the layer to be turned on or off. Refer to Section 8-1.06, Suspensions, of the. Directing the contractor to move the portable flashing beacon after initial placement is change order work. Certain equipment, such as dike placement machines, can only operate off one side of the equipment and may need to be operated against live traffic. Confirm that the minimum lane widths in the standard special provisions and those shown on the Traffic Handling Plans match. Similarly, certain striping operations require the operator to operate against live traffic because of clearances. The contractor is responsible for accommodating pedestrians through or around the work zone whenever the work disrupts pedestrian facilities. PCMS can be used in place of an advance flagger to remove workers from the roadway to improve worker safety from traffic. Verify visibility and legibility requirements. Consider additional signage and temporary lighting for crossovers. 4-1202C (1a) Lane Closure System 4-1202C (2) Temporary Pedestrian Access Routes 4-1202C (3) Bridge Cleaning and Painting Activities 4-1202D Temporary Pavement Delineation 4-1202D (1) Temporary Pavement Markers 4-1203 During the Course of Work 4-1203A Flagging 4-1203B Temporary Traffic Control Devices 4-1203B (1) Traffic Cones Verify that the contractor has all components on hand before setting up any traffic control system and that all components meet the specifications requirements. Section 124 of the California Streets and Highways Code authorizes Caltrans to close or restrict the use of any state highway whenever it considers such actions necessary for these reasons: Closures may also be necessary after major earthquakes or other natural disasters. The contractor will not be able to access projects in LCS after the completion date. Maintain written records of orders given and actions taken. A set of contingency action plans for each stage of the activities to prevent late opening of the traffic lanes. Verify signs to be used comply with the specification requirements. Facilitates review and approval of TMP measures and planned lane closure requests. This requirement may mean closing an extra lane. Verify channelizers used for temporary edge line delineation are predominantly orange and the surface- mounted type. Check Current Highway Conditions Enter Highway Number(s) You can also call 1-800-427-7623 for current highway conditions. Obtain from the contractor, the completed Form CEM-2311, Temporary Pedestrian Access Route Contractor Compliance Report, within 2 business days after construction of a temporary pedestrian access route. Do not allow the contractor to mix different types of temporary traffic control devices on the same alignment. Check for live traffic conditions. For example, a project that will occur Monday through Thursday for the next week would require only one task order. Critical work activities are those performed in a closure that would render any portion of the traveled way unsuitable for public traffic use. Confirm that the contractor cancels scheduled closures that are not needed at least 2 days in advance, using the LCS. Construction staff needs to complete the job-related temporary pedestrian facilities training within 6 months of assignment to inspect or administer contracts if they have not taken the online training within the previous 3 years. District Construction should review the traffic control plan before the district submits the plans, specifications, and estimate to headquarters. Review Section 12-3.11, Construction Area Signs, of the Standard Specifications for additional requirements. The state representative assigned to the project should make sure the local agency resident engineer performs the duties as outlined above. Once assigned to the project, do the following: When others administer the contract, oversight of traffic through and around a work zone involves overseeing and working with the local agency or private entitys resident engineer. Verify that the contractor installs, relocates, covers, and removes signs as required. Refer to Section 7-1.04, Public Safety, of the Standard Specifications, and Topic 902, Sight Distance and Clear Recovery Zone Standards, of the Highway Design Manual. Some reviews should take place at night, particularly when a major traffic change has taken place. During the planning and design phase of any project, an impact study is made for a proposed prolonged ramp closure. Dirt is not an acceptable surface. The LCS will generate email notifications to the resident engineer and the district traffic manager when the contractor cancels a closure. If the contractor requests modifications to the contract traffic control plans, refer them to Section 7-1.04, Public Safety, of the. Consider driver expectation and ambient light in the area of the crossover for temporary lighting. QuickMap Know before you go. Consideration for worker safety and the safe movement of traffic through work zones starts with planning. Administration of traffic control may be delegated to another person assigned to the project. When conditions prevent starting the temporary surfacing at a square joint on the existing pavement, a treatment such as a light sand seal can establish the continuity of the traveled lane. Require the contractor to anchor bases of traffic cones that do not have enough size and weight to keep the cones in an upright position. Design for the speed that vehicles will travel. Generally, the district traffic operations office is responsible for this review activity. Take special care to consider areas in schools or senior citizen center locations. Determine when the contractor must submit a construction contingency plan. Supplemental construction work may be necessary to retain the existing roadways effective operating characteristics. Obtain a copy of the manufacturers operating instructions. Check with the COZEEP coordinator to determine location of the nearest CHP office that will be supporting your project. The following guidelines apply to the color and texture of pavement surfacing materials: The following guidelines apply to speed zones: Frequently, special provisions restrict work on the existing traveled way to a specified period at night. The area where the surfacing joins the existing roadway can be critical. Hand digging is required unless the location is free of underground utilities. Compensation for flaggers used for all movements of workers, construction vehicles, and equipment on or across lanes open to traffic will be included in the bid item of work involved. Road closures and delays are subject to change due to weather. Periodic project safety reviews should note deficient areas and provide recommendations for the contractor to correct those deficiencies. Contact Construction at headquarters for a current hard copy. Verify that the weight of the attenuator and the weight of the support truck are within the specified limits as shown on the Authorized Material List for Highway Safety Features. Treat the traffic lanethe path the car is intended to followas a critical element of the roadway. Traffic queuesContain traffic queues completely within the advance warning signs of any closure. Sometimes through traffic tends to follow an exiting vehicle. Where the prevailing speed of the approach is limited by alignment, the design speed should be equal to the prevailing speed of the approach roadway. When the work has safely progressed beyond the supplemental taper, remove the upstream taper and tangent. The CHP has 5 working days to notify Caltrans if the actual travel time, mileage, or both, are greater than the allowances estimated on the daily report. Retain documentation of these reviews in Category 6, Safety, of the project records. If the operation is terminated before completion of the planned work because of circumstances within the contractors control or because of equipment breakdown, do not allow compensation and charge a working day as appropriate. Section 2-1, Safety, of this manual covers the responsibilities of the districts construction safety coordinator (CSC) who should periodically review the traffic handling for each project. Record inspection dates and conditions observed in the project records. Verify the crash cushion array is in place before opening traffic lanes adjacent to the protected obstacle. Emergency closures can be searched under Statewide. Camino, CA 95709 Some views of the snow from Sat. Verify that the sign complies with the requirements of Section 12-3.32, "Portable Changeable Message Signs," of the Standard Specifications, including number of lines and characters in a line, display modes, power source, and devices to plumb and level the trailer. Refer to Section 7-1.04, Public Safety, of the. During the term of the contract, the CHP may increase or decrease the rates shown in the contract by notifying the Caltrans statewide contract managers, who will notify the district coordinators. Verify that the color of the portable transverse rumble strips is black or orange and arranged in accordance with Standard Plan T13. The statewide agreement requires that cancellations be made during normal working hours and at least 24 hours before the time that the CHP is to arrive on the project. Capital projectsif insufficient funds are available in both supplemental work funds and contingency funds, propose a fund request. Portable Changeable Message Signs (PCMS) are required only during times, places, or activities stated in the plans and specifications and are not required when the traffic control system is nonoperational or for discretionary use. Do not allow the use of commercial pallets that exceed the maximum height. When AFAD are in use, allow the contractor to use portable vehicle transverse rumble strips, but do not allow the use of a 48-inch-by-48-inch C9A(CA) sign or gate cones. If flaggers are to be used, have flaggers take their stations; then move workers and equipment onto the road. Travel Alert California Winter Weather Wind, rain and snow -- heavy at times -- are forecast through early March Winter Driving Tips : be prepared, pack your patience and travel safely Know before you go: National Weather Service - Caltrans Social Media - Road Information or call 1-800-427-7623 Options Zoom to. Review these requirements with the contractors before work starts. Anticipated cooling times needed for asphalt concrete pavements before opening a lane, shoulder, or ramp to public traffic. The CHP coordinator at the local CHP area office will complete, sign, and return the form to the Caltrans construction office. Acts as the single focal point for all traffic decisions resulting from planned activities on the State Highway System. Verify the planned temporary signal system includes a backup power source and automatic transfer switches. It is an enhancement tool for construction zones and is not intended as a replacement for other temporary traffic control measures. Locate the transition so it is visible to the approaching motorist. Verify that the contractor schedules and conducts a meeting to discuss the operation of impact attenuator vehicle as required under Section 12-3.23A(4), Quality Assurance, of the Standard Specifications. Compare the traffic control plan to site conditions. Any part of the project within the limits stated in the order becomes a legal speed zone when signs are placed. Review the Public Safety section in the contract. Calculate the total estimated travel time and mileage, and enter the total on the COZEEP daily report. Generally such projects are intermediate type projects that cause minimal/moderate work zone impacts. Daytime ramp closures do not usually need COZEEP. Review the requests to avoid oversights and overbooking. Ask the contractor to remove nonoperating portable message signs from the job site away from traffic or protect it in accordance with Section 7-1.04 Public Safety, of the Standard Specifications. Published: Feb 06, 2023 California Invests Nearly $1 Billion for Transportation Improvements Caltrans Emergency Road Closures due to incidents impacts. Maintaining such closures is a full-time assignment, and the assigned worker should have no other duty. Return exceptions to the district and area offices involved for resolution. The invoice backup will include the COZEEP service summary and copies of cancellation notices. Welcome to Caltrans Planned Lane Closures The following reports are a public service of Caltrans. In addition, the plans provide traffic handling details during construction of the structure work per Traffic Handling Plans and related plans including TH-3 (Sheet 54 of advertised plans). If a discrepancy occurs between the contract plans and specifications and the California MUTCD, the plans and specifications govern. Verify that portable flashing beacons comply with the requirements in Section 12-3.31, "Portable Flashing Beacons," of the Standard Specifications. As funding and operations allow, consider providing COZEEP for the following situations: Generally, COZEEP is not necessary when only one lane is closed on freeways with four or more lanes in the same direction of travel. TMPs should be consistent with the Final Rule guidelines for developing and implementing the policy. When construction activities involve railroad rights-of-way or grade crossings, contact the district railroad liaison agent to confirm that all processes are complete and that the contractor may begin work. Confirm the intended vehicle path is clearly visible. Evaluate the COZEEP use criteria for lane closures on freeway-to-freeway connectors and for night closures of exit and entrance ramps. Contact the district traffic engineer for recommendations if the clearance to the traffic lane cannot be obtained. 124000 and that a designed temporary pedestrian access route (TPAR) is part of the contract plans or that the TPAR Standard Plans are appropriate for the pedestrian route affected by the work activities. During the course of work, monitor the contractors activities to verify closures are statused in LCS as follows: The LCS will notify the resident engineers and designated inspectors by email when the contractor changes the status of a closure. SignsReview sign line of sight visibility and verify it complies with Section 12-3.11, Construction Area Signs, of the, Vertical and horizontal curvesVerify tapers are visible for their entire length to approaching traffic. Inspect all traffic control devices to verify conformity with the specifications. Under the agreement, Caltrans pays the CHP for furnishing officers and cars for construction zones. The California Highway Patrol. Move the workers and equipment onto the closed lanes only after all system components are in place. The cost estimate used in the plans, specifications, and estimate is based on the expected number of events needing COZEEP identified during project development. The contractor is responsible for accommodating pedestrians through or around the work zone. Critical stage for each operation when the alternative or additional equipment, materials, or workers must be activated.
Cook County Hospital Jobs Taleo,
What Time Does It Get Dark During Daylight Savings,
Articles C